Prediction of Soil and Water Loss in Construction Period of Agang Reservoir Hub Project Area

Jian-ming HUANG, Yun-ping CHEN

Abstract


The construction of the reservoir project will lead to an increase in the soil erosion modulus of the project site and a corresponding increase in soil erosion. By determining the prediction period, content and method of soil erosion. Quantitative prediction of soil erosion during construction period based on relevant regulations and collected data. The forecast results provide a basis for the subsequent deployment of soil erosion control measures. At the same time, it provides scientific basis and technical support for the rational arrangement of soil and water conservation and ecological restoration measures of the project.

Keywords


Soil Erosion, Prediction, Prevention, Water Conservancy Project


DOI
10.12783/dteees/icepe2019/28926

Refbacks

  • There are currently no refbacks.