Abstract
The article presents a model for cost estimating in the early phase of investment using Case Based Reasoning. The author made a brief review of the literature in which he outlined other models supporting cost estimating in the concept phase. Then were presented the theoretical basis of the model and algorithm of conduct. The article illustrated an example of costs calculations for the construction of sports fields. At the end the results achieved in the own model was compared to the other described models.