Cost Estimating of Football Pitches Construction in the Concept Phase Using Case Based Reasoning

Krzysztof ZIMA

Abstract


The article presents a model for cost estimating in the early phase of investment using Case Based Reasoning. The author made a brief review of the literature in which he outlined other models supporting cost estimating in the concept phase. Then were presented the theoretical basis of the model and algorithm of conduct. The article illustrated an example of costs calculations for the construction of sports fields. At the end the results achieved in the own model was compared to the other described models.

Keywords


Case Based Reasoning, construction cost, cost estimation


DOI
10.12783/dtem/iceme2017/11760

Refbacks

  • There are currently no refbacks.